ATLAS Pixel - Module task force

Minutes of the 20 March 2006 phone conference

Attending: A. Andreazza, J.-C. Clemens, M. Cristinziani, M. Garcia-Sciveres, C. Gemme, J. Grosse-Knetter, I. Ibragimov, J. Walbersloh, W. Walkowiak.
  1. News on bare modules and components assembly and deliveries:
    1. deliveries from AMS
      No new deliveries from AMS.
      After the ATLAS-AMS meeting on Tuesday:
      repair of the bonder is expected Wednesday or Thursday;
      remaining 216 tiles for more modules at AMS, number of FE chips matches the number of tiles.
    2. deliveries from IZM
      Of the 18 modules received last week:
      12 tested in Bonn: 10 OK, 1 bump problem, 1 damaged sensor;
      6 tested in Dortmund, all Ok and already assembled.
      16 modules expected to be delivered on Wednesday
      Bare module logbooks for IZM, from which a lower yield that the one claimed by Joerg was apparent, have been updated to properly show the actual situation.
    3. distribution and flow of components (type 0 cables, shipping frames, FlexMCC)
      Some available shipping plates from CPPM have been sent to Siegen.
      31 bare module boxes have been returned from Dortmund to Milano.
      Missing flex module travelers sent from Dortmund to CPPM.
      Maurice should urgently send ARCLAD tape to Dortmund.
      - inventory of trashed flex hybrid
      Report from Siegen
      Updated report from Genova
      Bonn report to be sent this week.
      Claudia reports that she assembled three modules using repaired FlexMCC (backside below the pigtail burnt during pigtail gluing and now covered by kapton tape). These modules have been heavily tested and no defect has been seen.
      She therefore will continue to assemble the 6 remaining FlexMCC.
      There are also few other FlexMCC that have been recovered.
      To assembly such devices, Attilio should send some new bare modules to Genova.
  2. Assembly of AMS Modules in Siegen
    Iskander'swritten report and pictures
    In Iskander's report are marked the total number of pixels dead at the source test and the fraction of these pixel which is dead because they cannot be tuned (TDAC=127). From previous experience, these can be channels with shorted bumps. The remaining dead pixels should be disconnected ones.
    The bare module used were all "first class" modules, with very few (<10) disconnected channels at bare module probing, so this is evidence of damage in assembly. This damage is serious in some modules, but not a major disaster. Moreover, since it is not affected by thermal cicling, it is unlikely develop further in the future.
    The assembly team has been warned to be extremely careful with AMS modules and it seems the latest modules have a lower damage.
    Joerg confirms a similar situation in Dortmund, even if there are not data published yet (he will try to get a summary table next week). Unfortunately no action can be taken immediately, since all modules available in dortmund have already been assembled.
  3. Inventory of hospitalized modules (link from previous meeting).
    Report from Bonn
    Report from Dortmund
    Report from LBL
    Report from Genova
    Report from Siegen
    Last meeting a more careful debugging report, especially for MCC failures, has been requested.
    Maurice has created a wiki page which is to be filled with a debugging check list
    Some news about debugging in Genova (visible in the above report):
    Joerg will provide an update list of Dortmund hospital, updating the named MCC failures which have been traced to be due to bad elco connectors.
  4. AOB.

Attilio Andreazza, Dipartimento di Fisica, via Celoria 16, 20133 Milano